Sixty-year-old fuse box, window AC on an extension cord, and a dryer that dimmed the living room. We ran a fresh load calc, swapped in a 200A panel with copper grounding, and coordinated the utility cut-over so the family lost power for six hours, not a weekend.
The result: every breaker labeled, room for the EV charger they are planning, and a passed inspection on the first visit.