Skip to content

Hot tub circuit + exterior panel work

A new hot tub, a panel with no room, and a long run across the yard. We added capacity, trenched the feed, and set the GFCI disconnect where code wants it and the owner can reach it.

Inspected, labeled, and running the same week the tub was delivered.

Tell us about the job.

Two minutes now, a straight answer within one business day. No pressure, no adjective soup.